Does the building pay? NOI and DSCR, worked out
Work out the net operating income (rent collected minus the cost of running the building), then divide it by the yearly loan payments. That ratio, the DSCR, is the lender's first question; most want 1.20 to 1.25 or more.
How to work it out
- Gross rent. Units × average rent × 12.
- Take off vacancy. Lenders usually assume 5% to 7% of rent is lost to empty units and unpaid rent, even in tight markets.
- Add other income. Laundry, parking, fees.
- Take off operating costs. Management, taxes, insurance, utilities, repairs and reserves. For apartments this often runs 35% to 45% of collected income. What is left is the NOI.
- Divide by the loan payments. NOI ÷ a year of principal and interest = DSCR. Below 1.00, the building does not cover its loan.
A worked example
A 12-unit building rents at $1,100 a unit a month, with 6% vacancy, other income of 2%, operating costs of 40%, and a $1,200,000 loan at 7% over 30 years.
- Gross rent: 12 × $1,100 × 12 = $158,400. Less 6% vacancy ($9,504) = $148,896.
- Plus 2% other income ($2,978) = $151,874 collected.
- Less 40% operating costs ($60,750) = NOI of $91,124.
- Loan payments: about $95,804 a year. DSCR = $91,124 ÷ $95,804 = 0.95.
- At 0.95 the building does not cover its loan. At a 1.25 ratio, this NOI supports a loan of about $913,112, so the deal needs more equity, more rent or lower costs.
What to have ready
- Number of units (or leasable square feet)
- Average rent
- Expected vacancy
- Operating costs, or a share of income
- Loan amount, rate and term
Do it in ProForma, free, in your browser. ProForma works out NOI, DSCR, yield on cost and cash-on-cash, and lays out a 10-year cash flow. It can pull a rent average from a MarketScope analysis.
Open ProFormaThe example's vacancy, costs and loan terms are illustrations; use your own, and a lender's actual terms.
More free guides
Which grants fit your organization? A 10-minute checkHow to build a capital stack and find the financing gapWhat a lender-ready market study includesFrom a lot to a site plan: setbacks and buildable areaHow to explain a housing project to an architect, a contractor or a lenderHow to size the market for a new locationHow to find your break-even point and your runway